PROJECT PROFILE

School stays open during repairs

PROJECT PROFILE

School stays open during repairs

Project Description

70,000 sq ft gravel on top of the polyethylene sheet on top of smooth multi-ply surface system restoration that kept the school open while doing repairs

Project Details

Project Size/Substrate

70,000 sq ft school

Condition

Pre-existing gravel, on top of polyethelen slip sheet, on top of a smooth mulit-ply surface.

Video: Humble School - TRT: 1min 18sec

Materials Used

COATINGS

LEARN MORE >

TRP #924 Direct Bond Silicone

SEALANTS

LEARN MORE >

TRP #9400 Seam Sealer

Outcome

Fully foam and coating restoration, without having to close down the school. Backed by a 15 year warranty!

Recent Roof Restorations

Iskoteen Judicial Complex / Dulce, NM

To repair Minor leaks around roof drains, and penetrations.

LEARN MORE >

Terraces at Paradise Lakes – Land O’ Lakes, FL

The 10-year Warranty on the existing acrylic coating system that was on the roof had expired.

LEARN MORE >

Los Feliz Towers

The existing SPF foam with Acrylic coating was beginning to fail.

LEARN MORE >

Plantation Golf & Country Club – Venice, FL

Leaks in around penetration area and perimeter of parapet walls.

LEARN MORE >